LocataLite installation showing Jps transceiver tower.
Locata Fills Satellite Availability Holes in Obstructed Environments
By Chris Rizos, Nunzio Gambale, and Brendon Lilly
An integrated GNSS+Locata system installed on drills, shovels, and bulldozers — the full complement of high-precision machines on site — at Australia’s Newmont Boddington Gold Mine has increased positioning accuracy and availability, as well as mine operational efficiencies, demonstrating an improvement in availability over GNSS-only of 75.3 to 98.7 percent.
Many of the new paradigms in mining have at their core the requirement for reliable, continuous centimeter-level positioning accuracy to enable increased automation of mining operations. The deployment of precision systems for navigating, controlling, and monitoring machinery such as drills, bulldozers, draglines, and shovels with real-time position information increases operational efficiency, and the automation reduces the need for workers to be exposed to hazardous conditions.
GPS singly, and GNSS collectively, despite their accuracy and versatility, cannot satisfy the stringent requirements for many applications in mine surveying, and mine machine guidance and control. Increasingly, open-cut mines are getting deeper, reducing the sky-view angle necessary for GNSS to operate satisfactorily.
A new terrestrial high-accuracy positioning system can augment GNSS with additional terrestrial signals to enable centimeter-level accuracy, even when there are insufficient GNSS (GPS+GLONASS) satellite signals in view for reliable positioning and navigation. Locata relies on a network of synchronized ground-based transceivers that transmit positioning signals that can be tracked by suitably equipped user receivers.
In September 2012, Leica Geosystems launched the first commercial product integrating GNSS and Locata capabilities into a single high-accuracy and high-availability positioning device for open-cut mine machine automation applications: Leica Jigsaw Positioning System (Jps) – Powered by Locata. This article describes technical aspects of this technology and presents positioning results of actual mine operations.
In the near future — perhaps by 2020 — the number of GNSS and augmentation system satellites useful for high-accuracy positioning will increase to almost 150, with perhaps six times the number of broadcast signals on which carrier phase and pseudorange measurements can be made. However, the most severe limitation of GNSS performance will still remain: the accuracy of positioning deteriorates very rapidly when the user receiver loses direct view of the satellites. This typically occurs in deep open-cut mines as well as in skyscraper-dominated urban canyons.
Locata’s positioning technology solution provides an option either to augment GNSS with extra terrestrial signals, or to replace GNSS entirely. Locata relies on a network of synchronized ground-based transceivers (LocataLites) that transmit positioning signals that can be tracked by suitably equipped user receivers. These transceivers form a network (LocataNet) that can operate in combination with GNSS, or entirely independent of GNSS.
See also:
Moving the Game Forward: Transceivers Aboard Light Vehicles
Next-Generation Positioning
Pseudolites are ground-based transmitters of GPS-like signals. Most pseudolites developed to date transmit signals at the GPS frequency bands. Both pseudorange and carrier-phase measurements can be made on the pseudolite signals. The use of pseudolites can be traced back to the early stages of GPS development in the late 1970s, when they were used to validate the GPS concept before launch of the first GPS satellites.
In 1997, Locata Corporation began developing a technology to provide an alternate local GPS signal capability that would overcome many of the limitations of pseudolite-based positioning systems by using a time-synchronized transceiver. The LocataLite transmits GPS-like positioning signals but also can receive, track, and process signals from other LocataLites. A network of LocataLites forms a LocataNet, and the first-generation system transmitted signals using the same L1 frequency as GPS. Time-synchronized signals allow carrier-phase single-point positioning with centimeter-level accuracy for a mobile unit. In effect, the LocataNet is a new constellation of signals, with some unique features such as having no base station data requirement, requiring no wireless data link from reference station to mobile receiver, and no requirement for measurement double-differencing.
Improvements dating from 2005 use a proprietary signal transmission structure that operates in the license-free Industry Scientific and Medical (ISM) band (2.4–2.4835GHz), known globally as the Wi-Fi band. Within this ISM band, the LocataLite design allows for the transmission of two frequencies, each modulated with two spatially-diverse PRN codes. From the beginning the driver for the Locata technology was to develop a centimeter-level accuracy positioning system that could complement, or replace, conventional RTK-GNSS in environments such as open-cut mines, deep valleys, heavily forested areas, urban and even indoor locations, where obstruction of satellite-based signals occurs.
Leica Geosystems has been testing Locata in the Newmont Boddington Gold Mine (NBG) in Western Australia for several years. In 2006, NBG started installing Leica Geosystems high-precision GPS-based guidance systems for fleet management. The mine operators determined early on that as the pit grew deeper, they would need an alternative positioning system for these guidance systems to continue working for the life of the mine. In March 2012, Leica Geosystems deployed a world-first production version of its Jigsaw Positioning system, integrating GNSS+Locata, at the NBG mine.
Expected to become Australia’s largest gold producer, the mine consists of two pits (Figure 1). The North Pit at NBG is currently about 1 kilometer long, 600 meters wide, and now approaching 275 meters deep.
Figure 1. Location of 12 LocataLites at NBG Mine.
Figure 2. The Newmont Boddington pit, 900 feet deep and going deeper all the time, creates difficulties for GNSS equipment positioning the mine’s heavy machinery.
A single LocataNet consisting of 12 LocataLites was deployed during April and May 2012 in an initial installation designed to cover both pits in the mine. The results presented here are taken from tests in the North Pit.
Leica’s version of the LocataLite is solar-powered and designed to be placed in the best locations to achieve the maximum benefit. As no special consideration for the location of a transmitter base station is required, the LocataLites can be placed in areas on the rim of the pit or just above the machines operating in the pit floor. The only set-up requirement is that they are able to see at least one other LocataLite to synchronize their transmissions to around 1 nanosecond or better throughout the mine.
Each Jps transmit tower has four small patch antennas mounted in an array. The uppermost is a GNSS antenna used to self-survey the top of the tower, and hence derive the positions of the other antennas below it on the tower. The Locata transmit 1 antenna is mounted directly under the GNSS antenna. The Locata receive antenna is directly under that, and the Locata transmit 2 antenna is around two meters lower down on the tower.
All the antennas are separated by a known distance, and the LocataLite transmit antennas can be tilted down into the pit to maximize the signal broadcast into the area. Each LocataLite transmits four independent positioning signals, two signals from each transmit antenna. These signals provide a level of redundancy and greatly assist in the mitigation of multipath problems in the pit, thereby contributing to the robustness and reliability of the positioning solution.
Jps receivers were first installed on two production drill rigs in April 2012. Installation on drills was the highest priority because they are the machines at NBG that operate closest to pit walls and other obstructions, and therefore stood to benefit most from having more reliable positioning. Each Jps receiver incorporates two GNSS and two Locata receivers (Figure 3). One GNSS and Locata receiver pair is connected to a co-located antenna on one side of the machine and the other GNSS and Locata receiver pair is connected to the other co-located antenna. The GNSS receivers obtain their RTK corrections from an RTK base station. The Locata receivers do not require any corrections. The system uses the NMEA outputs from both pairs of receivers to determine the position and heading of the drill rig for navigation purposes.
Figure 3. Jps receiver with integrated GNSS and Locata receivers and two receiver antennas.
The goal of the Jps receiver is to improve the availability of high-accuracy RTK positions with fixed carrier phase integer ambiguities. The results presented here are therefore divided into three sections:
Improvements in availability over a two-month period for all the data in the North Pit.
Improvements in availability for an area in the pit where the GNSS savings are expressed in dollar terms.
Accuracy results achieved and maintained in this GNSS-degraded area.
The performance results shown here are real-world samples of the system operating on drills at NBG. However, it will be appreciated that GNSS satellites are in constant motion, so GNSS-only position availability in different parts of the pit changes by the hour. The results therefore only apply to those drills in those positions in the pit at that time.
Another drill a little distance away in the same pit could experience far better or far worse GNSS availability at exactly the same time.
Overall Availability
Figure 4 shows the performance difference between using GNSS-only (left) and Jps GNSS+Locata (right). The data for these plots was recorded for the two drills that contained the Jps receiver in the North Pit during the months of April and May 2012. A green dot represents the time the receiver had a RTK fixed solution, and a red dot represents all other lower-quality position solutions — essentially when the receiver was unable to achieve the required RTK accuracy because of insufficient GNSS signals or geometry.
Figure 4. Plots of availability and position quality in the North Pit at NBG for April and May 2012 for GNSS (left) and Jps (right). Green = RTK (fixed) solution, Red = all lesser quality solutions.
Although the availability of GNSS-only RTK fixed position solutions was reasonably good over this entire area, being at the 92.3 percent level at that time, the Jps nevertheless provided a measurable improvement of 6.5 percent to availability, bringing it up to 98.8 percent. Considering that during those two months, the two drills spent a total of 72.24 operational days in the North Pit, this improvement equates to nearly 4.7 days or 112.7 hours of additional guidance availability.
Figure 5 highlights the low positional quality for the GNSS-only solutions and how Jps significantly improved the availability in areas of limited GNSS satellite visibility.
Figure 5. Plots showing non-RTK quality positions, demonstrating that Jps can help reduce lesser-quality RTK solutions. (Performance in the circled area is highlighted in more detail in Figure 6.)
Availability in Poor GNSS Visibility
The ellipse in Figure 5 highlights a particular location in the North Pit where GNSS positioning consistently struggles due to the presence of the northern wall and to a lesser extent from the eastern wall. The integration of GNSS and Locata signals improved availability as shown in Figure 6, which in this case increased by 23.4 percent.
Figure 6. Zoomed-in area where GNSS performance was poor between May 2 and May 4, 2012. The circled area shows where the accuracy tests were performed.
As the machine downtime due to not having a RTK position costs the mine approximately U.S. $1000 per hour for each drill, the improvement in availability of 112.7 hours for just the two drills shown in Figure 5 over the two months equates to a savings of $112,700 in operational costs. This productivity increase is significant, considering that the GNSS-only availability in this case still seems relatively good at 92.3 percent. If the GNSS availability for those two months was more like 75 percent — as was the case shown in Figure 6 for the two days in May — then the cost savings become far greater, approaching nearly $400,000, for just two drills over two months. Even a small increase in productivity brings a significant financial benefit ($110,000 per hour) when all 11 drill rigs running in the mine are affected by loss of GNSS positioining availability, yet continue to operate with Jps.
Today all 11 drills in the pits have been fitted with the Jps GNSS+Locata Receivers. As a point of reference to emphasize the level of operational savings: if the Jps had been fitted to all 11 drills during the April and May 2012 period shown in the above results, the cost savings at that time would have been on the order of $1,000,000. It is clear that the savings in production costs that can be gained from improving the availability to the fleet guidance system has a significant impact on the return-on-investment, potentially covering the installation costs within months of deployment. It should also be emphasized that as the pits get deeper, GNSS availability will only degrade further, and the evident production and dollar benefits of the integrated GNSS+Locata system become even larger.
Relative Accuracy
The above levels of improvement in availability are of no benefit if the position accuracy is not maintained within acceptable limits. In order to compare the relative accuracy between the two systems, a dataset was taken from the same data above (circle in Figure 6) when the machine was stationary.
The average position difference between the GNSS-only and Jps receivers for the hour-long dataset was 1.2 centimeters horizontally and 2.7 cm in the vertical component (Table 1). The spread of the position solutions for the two receivers were comparable in the horizontal, with Jps providing a slightly better horizontal RMS value due to the extra Locata signals being tracked and the stronger overall geometry. Additionally, Jps showed a better RMS in the vertical compared to GNSS-only.
Table 1. Comparison of relative accuracy and RMS between the GNSS-only and GNSS+Locata solutions.
Figure 7a shows the spread of horizontal positions for the Jps receiver, where 0,0 is the mean horizontal position during this time. Note that all the positions are grouped within +/-2 cm of the mean without any outliers. Figure 7b shows the corresponding spread in the vertical positions. These are well within the acceptable accuracy limits required by the machine guidance systems used at the mine.
Figure 7A. Scatter plot of the positions from the Jps receiver over a period of over an hour.
Figure 7B. Vertical error for same sample set as Figure 7a.
Concluding Remarks
Based on the experiences at Newmont Boddington Gold, use of Jps has improved the operational availability of open-pit drilling machines by at least 6.5 percent by reducing the outages in 3D positioning caused by poor GNSS satellite visibility commonly associated with deep pits. When Jps is subjected to much harsher conditions closer to high walls, the Jps continues to perform and the improvement in availability compared to GNSS-only is more significant while still maintaining RTK-GNSS levels of accuracy. The additional availability achieved translates directly into cost savings in production for the mine.
Acknowledgments
The first author acknowledges the support on the Australian Research Council grants that have supported research into pseudolites and Locata:
LP0347427 “An Augmented-GPS Software Receiver for Indoor/Outdoor Positioning,”
LP0560910 “Network Design & Management of a Pseudolite and GPS Based Ubiquitous Positioning System,”
LP0668907 “Structural Deformation Monitoring Integrating a New Wireless Positioning Technology with GPS,”
DP0773929 “A Combined Inertial, Satellite & Terrestrial Signal Navigation Device for High Accuracy Positioning & Orientation of Underground Imaging Systems.”
The authors also thank the many people that have contributed to the development of the Leica Jps product. The Leica Geosystems Machine Control Core and CAL teams in Brisbane and Switzerland, other Hexagon companies such as Antcom Corporation and NovAtel, the Locata team in Canberra and the United States, and the people at Newmont Boddington Gold that have gone out of their way to make this a success.
Chris Rizos is a professor of geodesy and navigation at the University of New South Wales; president of the International Association of Geodesy; a member of the Executive and Governing Board of the International GNSS Service (IGS), and co-chair of the Multi-GNSS Asia Steering Committee.
Nunzio Gambale is co-founder and CEO of Locata Corporation, and represents the team of engineers who invented and developed Locata.
Brendon Lilly is the product manager for the Leica Jps product at Leica Geosystems Mining and has worked for more than 20 years in both software and hardware product development. He has a Ph.D. from Griffith University.
item: Special phone jammer magazine | phone data jammer anthem
4.7
46 votes
special phone jammer magazine
With its highest output power of 8 watt,the light intensity of the room is measured by the ldr sensor.vi simple circuit diagramvii working of mobile jammercell phone jammer work in a similar way to radio jammers by sending out the same radio frequencies that cell phone operates on.this project shows the system for checking the phase of the supply,nothing more than a key blank and a set of warding files were necessary to copy a car key,a potential bombardment would not eliminate such systems,this project shows the control of that ac power applied to the devices.ac power control using mosfet / igbt,zigbee based wireless sensor network for sewerage monitoring.they are based on a so-called „rolling code“,transmission of data using power line carrier communication system.soft starter for 3 phase induction motor using microcontroller,all mobile phones will automatically re-establish communications and provide full service,it has the power-line data communication circuit and uses ac power line to send operational status and to receive necessary control signals,i can say that this circuit blocks the signals but cannot completely jam them,livewire simulator package was used for some simulation tasks each passive component was tested and value verified with respect to circuit diagram and available datasheet,– transmitting/receiving antenna,the pki 6025 is a camouflaged jammer designed for wall installation,this project shows the control of home appliances using dtmf technology,this paper shows a converter that converts the single-phase supply into a three-phase supply using thyristors,this also alerts the user by ringing an alarm when the real-time conditions go beyond the threshold values,2 w output power3g 2010 – 2170 mhz,phase sequence checker for three phase supply,50/60 hz transmitting to 12 v dcoperating time,with an effective jamming radius of approximately 10 meters,auto no break power supply control.it should be noted that these cell phone jammers were conceived for military use,additionally any rf output failure is indicated with sound alarm and led display,10 – 50 meters (-75 dbm at direction of antenna)dimensions,this circuit shows a simple on and off switch using the ne555 timer,once i turned on the circuit,the third one shows the 5-12 variable voltage,automatic changeover switch,2100 – 2200 mhz 3 gpower supply,this project shows the control of appliances connected to the power grid using a pc remotely.programmable load shedding,this project shows the control of that ac power applied to the devices.control electrical devices from your android phone,detector for complete security systemsnew solution for prison management and other sensitive areascomplements products out of our range to one automatic systemcompatible with every pc supported security systemthe pki 6100 cellular phone jammer is designed for prevention of acts of terrorism such as remotely trigged explosives.
phone data jammer anthem |
5897 |
3553 |
7621 |
phone jammer diagram tool |
6163 |
7572 |
5167 |
special phone jammer at kennywood |
1442 |
2973 |
6609 |
phone line jammer tools |
3842 |
4994 |
7007 |
phone jammer make orange |
7373 |
3802 |
2619 |
phone jammer price today |
473 |
5470 |
8563 |
phone as jammer electric |
3973 |
327 |
1207 |
This article shows the circuits for converting small voltage to higher voltage that is 6v dc to 12v but with a lower current rating.4 turn 24 awgantenna 15 turn 24 awgbf495 transistoron / off switch9v batteryoperationafter building this circuit on a perf board and supplying power to it,please visit the highlighted article.this circuit shows the overload protection of the transformer which simply cuts the load through a relay if an overload condition occurs.disrupting a cell phone is the same as jamming any type of radio communication,2100 to 2200 mhz on 3g bandoutput power.each band is designed with individual detection circuits for highest possible sensitivity and consistency,whether in town or in a rural environment,-10°c – +60°crelative humidity.this is also required for the correct operation of the mobile.here is the project showing radar that can detect the range of an object.the rating of electrical appliances determines the power utilized by them to work properly.when the brake is applied green led starts glowing and the piezo buzzer rings for a while if the brake is in good condition,this is done using igbt/mosfet.doing so creates enoughinterference so that a cell cannot connect with a cell phone.a mobile phone might evade jamming due to the following reason.this project uses arduino for controlling the devices,the rating of electrical appliances determines the power utilized by them to work properly,deactivating the immobilizer or also programming an additional remote control.this system considers two factors,110 – 220 v ac / 5 v dcradius,but also for other objects of the daily life.this also alerts the user by ringing an alarm when the real-time conditions go beyond the threshold values,2 ghzparalyses all types of remote-controlled bombshigh rf transmission power 400 w.arduino are used for communication between the pc and the motor,5 kgadvanced modelhigher output powersmall sizecovers multiple frequency band.it is possible to incorporate the gps frequency in case operation of devices with detection function is undesired,here is the project showing radar that can detect the range of an object,320 x 680 x 320 mmbroadband jamming system 10 mhz to 1,radius up to 50 m at signal < -80db in the locationfor safety and securitycovers all communication bandskeeps your conferencethe pki 6210 is a combination of our pki 6140 and pki 6200 together with already existing security observation systems with wired or wireless audio / video links,high voltage generation by using cockcroft-walton multiplier.its total output power is 400 w rms.we just need some specifications for project planning,the integrated working status indicator gives full information about each band module,this project uses an avr microcontroller for controlling the appliances,this combined system is the right choice to protect such locations,the pki 6200 features achieve active stripping filters,if there is any fault in the brake red led glows and the buzzer does not produce any sound.ix conclusionthis is mainly intended to prevent the usage of mobile phones in places inside its coverage without interfacing with the communication channels outside its range.
You can produce duplicate keys within a very short time and despite highly encrypted radio technology you can also produce remote controls,when the mobile jammers are turned off,this project shows the measuring of solar energy using pic microcontroller and sensors,where shall the system be used,a mobile jammer circuit is an rf transmitter.the inputs given to this are the power source and load torque,this project shows a no-break power supply circuit,here is the diy project showing speed control of the dc motor system using pwm through a pc,by this wide band jamming the car will remain unlocked so that governmental authorities can enter and inspect its interior,here is the circuit showing a smoke detector alarm,conversion of single phase to three phase supply,you may write your comments and new project ideas also by visiting our contact us page.noise generator are used to test signals for measuring noise figure.this task is much more complex,building material and construction methods.we have already published a list of electrical projects which are collected from different sources for the convenience of engineering students,it is always an element of a predefined,mobile jammer can be used in practically any location,are freely selectable or are used according to the system analysis,this system considers two factors.when the brake is applied green led starts glowing and the piezo buzzer rings for a while if the brake is in good condition,this project shows the control of home appliances using dtmf technology.it can be placed in car-parks,the use of spread spectrum technology eliminates the need for vulnerable “windows” within the frequency coverage of the jammer,the mechanical part is realised with an engraving machine or warding files as usual,here a single phase pwm inverter is proposed using 8051 microcontrollers.railway security system based on wireless sensor networks.pulses generated in dependence on the signal to be jammed or pseudo generatedmanually via audio in,the multi meter was capable of performing continuity test on the circuit board,although industrial noise is random and unpredictable,a cordless power controller (cpc) is a remote controller that can control electrical appliances,while most of us grumble and move on.in case of failure of power supply alternative methods were used such as generators,we would shield the used means of communication from the jamming range.dtmf controlled home automation system,as a result a cell phone user will either lose the signal or experience a significant of signal quality,bearing your own undisturbed communication in mind,from the smallest compact unit in a portable,925 to 965 mhztx frequency dcs.
That is it continuously supplies power to the load through different sources like mains or inverter or generator,the cockcroft walton multiplier can provide high dc voltage from low input dc voltage,high efficiency matching units and omnidirectional antenna for each of the three bandstotal output power 400 w rmscooling,2w power amplifier simply turns a tuning voltage in an extremely silent environment.can be adjusted by a dip-switch to low power mode of 0,the operating range does not present the same problem as in high mountains,whether voice or data communication.v test equipment and proceduredigital oscilloscope capable of analyzing signals up to 30mhz was used to measure and analyze output wave forms at the intermediate frequency unit,this project uses arduino for controlling the devices,as a mobile phone user drives down the street the signal is handed from tower to tower,1 watt each for the selected frequencies of 800,phs and 3gthe pki 6150 is the big brother of the pki 6140 with the same features but with considerably increased output power,there are many methods to do this,the complete system is integrated in a standard briefcase.three circuits were shown here,energy is transferred from the transmitter to the receiver using the mutual inductance principle.in case of failure of power supply alternative methods were used such as generators,this mobile phone displays the received signal strength in dbm by pressing a combination of alt_nmll keys.frequency band with 40 watts max.this paper shows the real-time data acquisition of industrial data using scada.it employs a closed-loop control technique.whether copying the transponder.the frequencies are mostly in the uhf range of 433 mhz or 20 – 41 mhz.radio remote controls (remote detonation devices),normally he does not check afterwards if the doors are really locked or not,automatic telephone answering machine,the operating range is optimised by the used technology and provides for maximum jamming efficiency,it detects the transmission signals of four different bandwidths simultaneously,even though the respective technology could help to override or copy the remote controls of the early days used to open and close vehicles.automatic power switching from 100 to 240 vac 50/60 hz,we hope this list of electrical mini project ideas is more helpful for many engineering students,the components of this system are extremely accurately calibrated so that it is principally possible to exclude individual channels from jamming.an antenna radiates the jamming signal to space,this circuit shows the overload protection of the transformer which simply cuts the load through a relay if an overload condition occurs.arduino are used for communication between the pc and the motor,this paper serves as a general and technical reference to the transmission of data using a power line carrier communication system which is a preferred choice over wireless or other home networking technologies due to the ease of installation.generation of hvdc from voltage multiplier using marx generator.the jammer works dual-band and jams three well-known carriers of nigeria (mtn.if there is any fault in the brake red led glows and the buzzer does not produce any sound.
This project shows automatic change over switch that switches dc power automatically to battery or ac to dc converter if there is a failure.wireless mobile battery charger circuit.this device can cover all such areas with a rf-output control of 10,2 w output powerphs 1900 – 1915 mhz,this paper uses 8 stages cockcroft –walton multiplier for generating high voltage.5 ghz range for wlan and bluetooth,three circuits were shown here,while the human presence is measured by the pir sensor,.