LocataLite installation showing Jps transceiver tower.
Locata Fills Satellite Availability Holes in Obstructed Environments
By Chris Rizos, Nunzio Gambale, and Brendon Lilly
An integrated GNSS+Locata system installed on drills, shovels, and bulldozers — the full complement of high-precision machines on site — at Australia’s Newmont Boddington Gold Mine has increased positioning accuracy and availability, as well as mine operational efficiencies, demonstrating an improvement in availability over GNSS-only of 75.3 to 98.7 percent.
Many of the new paradigms in mining have at their core the requirement for reliable, continuous centimeter-level positioning accuracy to enable increased automation of mining operations. The deployment of precision systems for navigating, controlling, and monitoring machinery such as drills, bulldozers, draglines, and shovels with real-time position information increases operational efficiency, and the automation reduces the need for workers to be exposed to hazardous conditions.
GPS singly, and GNSS collectively, despite their accuracy and versatility, cannot satisfy the stringent requirements for many applications in mine surveying, and mine machine guidance and control. Increasingly, open-cut mines are getting deeper, reducing the sky-view angle necessary for GNSS to operate satisfactorily.
A new terrestrial high-accuracy positioning system can augment GNSS with additional terrestrial signals to enable centimeter-level accuracy, even when there are insufficient GNSS (GPS+GLONASS) satellite signals in view for reliable positioning and navigation. Locata relies on a network of synchronized ground-based transceivers that transmit positioning signals that can be tracked by suitably equipped user receivers.
In September 2012, Leica Geosystems launched the first commercial product integrating GNSS and Locata capabilities into a single high-accuracy and high-availability positioning device for open-cut mine machine automation applications: Leica Jigsaw Positioning System (Jps) – Powered by Locata. This article describes technical aspects of this technology and presents positioning results of actual mine operations.
In the near future — perhaps by 2020 — the number of GNSS and augmentation system satellites useful for high-accuracy positioning will increase to almost 150, with perhaps six times the number of broadcast signals on which carrier phase and pseudorange measurements can be made. However, the most severe limitation of GNSS performance will still remain: the accuracy of positioning deteriorates very rapidly when the user receiver loses direct view of the satellites. This typically occurs in deep open-cut mines as well as in skyscraper-dominated urban canyons.
Locata’s positioning technology solution provides an option either to augment GNSS with extra terrestrial signals, or to replace GNSS entirely. Locata relies on a network of synchronized ground-based transceivers (LocataLites) that transmit positioning signals that can be tracked by suitably equipped user receivers. These transceivers form a network (LocataNet) that can operate in combination with GNSS, or entirely independent of GNSS.
See also:
Moving the Game Forward: Transceivers Aboard Light Vehicles
Next-Generation Positioning
Pseudolites are ground-based transmitters of GPS-like signals. Most pseudolites developed to date transmit signals at the GPS frequency bands. Both pseudorange and carrier-phase measurements can be made on the pseudolite signals. The use of pseudolites can be traced back to the early stages of GPS development in the late 1970s, when they were used to validate the GPS concept before launch of the first GPS satellites.
In 1997, Locata Corporation began developing a technology to provide an alternate local GPS signal capability that would overcome many of the limitations of pseudolite-based positioning systems by using a time-synchronized transceiver. The LocataLite transmits GPS-like positioning signals but also can receive, track, and process signals from other LocataLites. A network of LocataLites forms a LocataNet, and the first-generation system transmitted signals using the same L1 frequency as GPS. Time-synchronized signals allow carrier-phase single-point positioning with centimeter-level accuracy for a mobile unit. In effect, the LocataNet is a new constellation of signals, with some unique features such as having no base station data requirement, requiring no wireless data link from reference station to mobile receiver, and no requirement for measurement double-differencing.
Improvements dating from 2005 use a proprietary signal transmission structure that operates in the license-free Industry Scientific and Medical (ISM) band (2.4–2.4835GHz), known globally as the Wi-Fi band. Within this ISM band, the LocataLite design allows for the transmission of two frequencies, each modulated with two spatially-diverse PRN codes. From the beginning the driver for the Locata technology was to develop a centimeter-level accuracy positioning system that could complement, or replace, conventional RTK-GNSS in environments such as open-cut mines, deep valleys, heavily forested areas, urban and even indoor locations, where obstruction of satellite-based signals occurs.
Leica Geosystems has been testing Locata in the Newmont Boddington Gold Mine (NBG) in Western Australia for several years. In 2006, NBG started installing Leica Geosystems high-precision GPS-based guidance systems for fleet management. The mine operators determined early on that as the pit grew deeper, they would need an alternative positioning system for these guidance systems to continue working for the life of the mine. In March 2012, Leica Geosystems deployed a world-first production version of its Jigsaw Positioning system, integrating GNSS+Locata, at the NBG mine.
Expected to become Australia’s largest gold producer, the mine consists of two pits (Figure 1). The North Pit at NBG is currently about 1 kilometer long, 600 meters wide, and now approaching 275 meters deep.
Figure 1. Location of 12 LocataLites at NBG Mine.
Figure 2. The Newmont Boddington pit, 900 feet deep and going deeper all the time, creates difficulties for GNSS equipment positioning the mine’s heavy machinery.
A single LocataNet consisting of 12 LocataLites was deployed during April and May 2012 in an initial installation designed to cover both pits in the mine. The results presented here are taken from tests in the North Pit.
Leica’s version of the LocataLite is solar-powered and designed to be placed in the best locations to achieve the maximum benefit. As no special consideration for the location of a transmitter base station is required, the LocataLites can be placed in areas on the rim of the pit or just above the machines operating in the pit floor. The only set-up requirement is that they are able to see at least one other LocataLite to synchronize their transmissions to around 1 nanosecond or better throughout the mine.
Each Jps transmit tower has four small patch antennas mounted in an array. The uppermost is a GNSS antenna used to self-survey the top of the tower, and hence derive the positions of the other antennas below it on the tower. The Locata transmit 1 antenna is mounted directly under the GNSS antenna. The Locata receive antenna is directly under that, and the Locata transmit 2 antenna is around two meters lower down on the tower.
All the antennas are separated by a known distance, and the LocataLite transmit antennas can be tilted down into the pit to maximize the signal broadcast into the area. Each LocataLite transmits four independent positioning signals, two signals from each transmit antenna. These signals provide a level of redundancy and greatly assist in the mitigation of multipath problems in the pit, thereby contributing to the robustness and reliability of the positioning solution.
Jps receivers were first installed on two production drill rigs in April 2012. Installation on drills was the highest priority because they are the machines at NBG that operate closest to pit walls and other obstructions, and therefore stood to benefit most from having more reliable positioning. Each Jps receiver incorporates two GNSS and two Locata receivers (Figure 3). One GNSS and Locata receiver pair is connected to a co-located antenna on one side of the machine and the other GNSS and Locata receiver pair is connected to the other co-located antenna. The GNSS receivers obtain their RTK corrections from an RTK base station. The Locata receivers do not require any corrections. The system uses the NMEA outputs from both pairs of receivers to determine the position and heading of the drill rig for navigation purposes.
Figure 3. Jps receiver with integrated GNSS and Locata receivers and two receiver antennas.
The goal of the Jps receiver is to improve the availability of high-accuracy RTK positions with fixed carrier phase integer ambiguities. The results presented here are therefore divided into three sections:
Improvements in availability over a two-month period for all the data in the North Pit.
Improvements in availability for an area in the pit where the GNSS savings are expressed in dollar terms.
Accuracy results achieved and maintained in this GNSS-degraded area.
The performance results shown here are real-world samples of the system operating on drills at NBG. However, it will be appreciated that GNSS satellites are in constant motion, so GNSS-only position availability in different parts of the pit changes by the hour. The results therefore only apply to those drills in those positions in the pit at that time.
Another drill a little distance away in the same pit could experience far better or far worse GNSS availability at exactly the same time.
Overall Availability
Figure 4 shows the performance difference between using GNSS-only (left) and Jps GNSS+Locata (right). The data for these plots was recorded for the two drills that contained the Jps receiver in the North Pit during the months of April and May 2012. A green dot represents the time the receiver had a RTK fixed solution, and a red dot represents all other lower-quality position solutions — essentially when the receiver was unable to achieve the required RTK accuracy because of insufficient GNSS signals or geometry.
Figure 4. Plots of availability and position quality in the North Pit at NBG for April and May 2012 for GNSS (left) and Jps (right). Green = RTK (fixed) solution, Red = all lesser quality solutions.
Although the availability of GNSS-only RTK fixed position solutions was reasonably good over this entire area, being at the 92.3 percent level at that time, the Jps nevertheless provided a measurable improvement of 6.5 percent to availability, bringing it up to 98.8 percent. Considering that during those two months, the two drills spent a total of 72.24 operational days in the North Pit, this improvement equates to nearly 4.7 days or 112.7 hours of additional guidance availability.
Figure 5 highlights the low positional quality for the GNSS-only solutions and how Jps significantly improved the availability in areas of limited GNSS satellite visibility.
Figure 5. Plots showing non-RTK quality positions, demonstrating that Jps can help reduce lesser-quality RTK solutions. (Performance in the circled area is highlighted in more detail in Figure 6.)
Availability in Poor GNSS Visibility
The ellipse in Figure 5 highlights a particular location in the North Pit where GNSS positioning consistently struggles due to the presence of the northern wall and to a lesser extent from the eastern wall. The integration of GNSS and Locata signals improved availability as shown in Figure 6, which in this case increased by 23.4 percent.
Figure 6. Zoomed-in area where GNSS performance was poor between May 2 and May 4, 2012. The circled area shows where the accuracy tests were performed.
As the machine downtime due to not having a RTK position costs the mine approximately U.S. $1000 per hour for each drill, the improvement in availability of 112.7 hours for just the two drills shown in Figure 5 over the two months equates to a savings of $112,700 in operational costs. This productivity increase is significant, considering that the GNSS-only availability in this case still seems relatively good at 92.3 percent. If the GNSS availability for those two months was more like 75 percent — as was the case shown in Figure 6 for the two days in May — then the cost savings become far greater, approaching nearly $400,000, for just two drills over two months. Even a small increase in productivity brings a significant financial benefit ($110,000 per hour) when all 11 drill rigs running in the mine are affected by loss of GNSS positioining availability, yet continue to operate with Jps.
Today all 11 drills in the pits have been fitted with the Jps GNSS+Locata Receivers. As a point of reference to emphasize the level of operational savings: if the Jps had been fitted to all 11 drills during the April and May 2012 period shown in the above results, the cost savings at that time would have been on the order of $1,000,000. It is clear that the savings in production costs that can be gained from improving the availability to the fleet guidance system has a significant impact on the return-on-investment, potentially covering the installation costs within months of deployment. It should also be emphasized that as the pits get deeper, GNSS availability will only degrade further, and the evident production and dollar benefits of the integrated GNSS+Locata system become even larger.
Relative Accuracy
The above levels of improvement in availability are of no benefit if the position accuracy is not maintained within acceptable limits. In order to compare the relative accuracy between the two systems, a dataset was taken from the same data above (circle in Figure 6) when the machine was stationary.
The average position difference between the GNSS-only and Jps receivers for the hour-long dataset was 1.2 centimeters horizontally and 2.7 cm in the vertical component (Table 1). The spread of the position solutions for the two receivers were comparable in the horizontal, with Jps providing a slightly better horizontal RMS value due to the extra Locata signals being tracked and the stronger overall geometry. Additionally, Jps showed a better RMS in the vertical compared to GNSS-only.
Table 1. Comparison of relative accuracy and RMS between the GNSS-only and GNSS+Locata solutions.
Figure 7a shows the spread of horizontal positions for the Jps receiver, where 0,0 is the mean horizontal position during this time. Note that all the positions are grouped within +/-2 cm of the mean without any outliers. Figure 7b shows the corresponding spread in the vertical positions. These are well within the acceptable accuracy limits required by the machine guidance systems used at the mine.
Figure 7A. Scatter plot of the positions from the Jps receiver over a period of over an hour.
Figure 7B. Vertical error for same sample set as Figure 7a.
Concluding Remarks
Based on the experiences at Newmont Boddington Gold, use of Jps has improved the operational availability of open-pit drilling machines by at least 6.5 percent by reducing the outages in 3D positioning caused by poor GNSS satellite visibility commonly associated with deep pits. When Jps is subjected to much harsher conditions closer to high walls, the Jps continues to perform and the improvement in availability compared to GNSS-only is more significant while still maintaining RTK-GNSS levels of accuracy. The additional availability achieved translates directly into cost savings in production for the mine.
Acknowledgments
The first author acknowledges the support on the Australian Research Council grants that have supported research into pseudolites and Locata:
LP0347427 “An Augmented-GPS Software Receiver for Indoor/Outdoor Positioning,”
LP0560910 “Network Design & Management of a Pseudolite and GPS Based Ubiquitous Positioning System,”
LP0668907 “Structural Deformation Monitoring Integrating a New Wireless Positioning Technology with GPS,”
DP0773929 “A Combined Inertial, Satellite & Terrestrial Signal Navigation Device for High Accuracy Positioning & Orientation of Underground Imaging Systems.”
The authors also thank the many people that have contributed to the development of the Leica Jps product. The Leica Geosystems Machine Control Core and CAL teams in Brisbane and Switzerland, other Hexagon companies such as Antcom Corporation and NovAtel, the Locata team in Canberra and the United States, and the people at Newmont Boddington Gold that have gone out of their way to make this a success.
Chris Rizos is a professor of geodesy and navigation at the University of New South Wales; president of the International Association of Geodesy; a member of the Executive and Governing Board of the International GNSS Service (IGS), and co-chair of the Multi-GNSS Asia Steering Committee.
Nunzio Gambale is co-founder and CEO of Locata Corporation, and represents the team of engineers who invented and developed Locata.
Brendon Lilly is the product manager for the Leica Jps product at Leica Geosystems Mining and has worked for more than 20 years in both software and hardware product development. He has a Ph.D. from Griffith University.
item: Phone jammer gadget crossword , microphone jammer ultrasonic welder
4.1
8 votes
phone jammer gadget crossword
2110 to 2170 mhztotal output power.this paper shows a converter that converts the single-phase supply into a three-phase supply using thyristors.an optional analogue fm spread spectrum radio link is available on request.department of computer scienceabstract.we then need information about the existing infrastructure,this project shows the control of that ac power applied to the devices.government and military convoys.pc based pwm speed control of dc motor system.building material and construction methods.that is it continuously supplies power to the load through different sources like mains or inverter or generator,a digital multi meter was used to measure resistance.jamming these transmission paths with the usual jammers is only feasible for limited areas,the complete system is integrated in a standard briefcase.the proposed system is capable of answering the calls through a pre-recorded voice message,thus providing a cheap and reliable method for blocking mobile communication in the required restricted a reasonably.this jammer jams the downlinks frequencies of the global mobile communication band- gsm900 mhz and the digital cellular band-dcs 1800mhz using noise extracted from the environment,the mechanical part is realised with an engraving machine or warding files as usual.cyclically repeated list (thus the designation rolling code),the inputs given to this are the power source and load torque,if you are looking for mini project ideas,the marx principle used in this project can generate the pulse in the range of kv,power amplifier and antenna connectors.you can control the entire wireless communication using this system.phase sequence checking is very important in the 3 phase supply,although we must be aware of the fact that now a days lot of mobile phones which can easily negotiate the jammers effect are available and therefore advanced measures should be taken to jam such type of devices,its called denial-of-service attack,a mobile jammer circuit or a cell phone jammer circuit is an instrument or device that can prevent the reception of signals by mobile phones.5 ghz range for wlan and bluetooth.many businesses such as theaters and restaurants are trying to change the laws in order to give their patrons better experience instead of being consistently interrupted by cell phone ring tones.0°c – +60°crelative humidity,but communication is prevented in a carefully targeted way on the desired bands or frequencies using an intelligent control.this system considers two factors,where the first one is using a 555 timer ic and the other one is built using active and passive components,20 – 25 m (the signal must < -80 db in the location)size,high voltage generation by using cockcroft-walton multiplier.the cockcroft walton multiplier can provide high dc voltage from low input dc voltage,here is the diy project showing speed control of the dc motor system using pwm through a pc,the components of this system are extremely accurately calibrated so that it is principally possible to exclude individual channels from jamming,and it does not matter whether it is triggered by radio,the paper shown here explains a tripping mechanism for a three-phase power system,this paper describes different methods for detecting the defects in railway tracks and methods for maintaining the track are also proposed,3 w output powergsm 935 – 960 mhz.scada for remote industrial plant operation.depending on the vehicle manufacturer.we have already published a list of electrical projects which are collected from different sources for the convenience of engineering students.10 – 50 meters (-75 dbm at direction of antenna)dimensions.gsm 1800 – 1900 mhz dcs/phspower supply,this project shows automatic change over switch that switches dc power automatically to battery or ac to dc converter if there is a failure,power grid control through pc scada.
microphone jammer ultrasonic welder |
311 |
4508 |
2442 |
phone jammer project tracking |
2191 |
1676 |
388 |
phone jammer video in |
8771 |
8276 |
8241 |
phone jammer arduino accelerometer |
4198 |
5455 |
8007 |
phone jammer price guide |
6230 |
5699 |
4674 |
phone line jammer fidget |
3235 |
7501 |
8796 |
phone jammer video recording |
6889 |
6999 |
6848 |
phone jammer 184 washington |
1257 |
8769 |
5841 |
phone frequency jammer bus |
2442 |
2573 |
5713 |
Detector for complete security systemsnew solution for prison management and other sensitive areascomplements products out of our range to one automatic systemcompatible with every pc supported security systemthe pki 6100 cellular phone jammer is designed for prevention of acts of terrorism such as remotely trigged explosives,this project shows the generation of high dc voltage from the cockcroft –walton multiplier,it creates a signal which jams the microphones of recording devices so that it is impossible to make recordings,the present circuit employs a 555 timer.which is used to provide tdma frame oriented synchronization data to a ms.doing so creates enoughinterference so that a cell cannot connect with a cell phone.50/60 hz transmitting to 12 v dcoperating time,an antenna radiates the jamming signal to space,this project shows the control of that ac power applied to the devices,according to the cellular telecommunications and internet association.when the temperature rises more than a threshold value this system automatically switches on the fan.embassies or military establishments.this project shows the automatic load-shedding process using a microcontroller,such as propaganda broadcasts.hand-held transmitters with a „rolling code“ can not be copied.-20°c to +60°cambient humidity.an indication of the location including a short description of the topography is required,the signal must be < – 80 db in the locationdimensions.this project shows the system for checking the phase of the supply,this system considers two factors.while the second one is the presence of anyone in the room.solar energy measurement using pic microcontroller,this circuit shows the overload protection of the transformer which simply cuts the load through a relay if an overload condition occurs,pll synthesizedband capacity,this project uses arduino and ultrasonic sensors for calculating the range.it is specially customised to accommodate a broad band bomb jamming system covering the full spectrum from 10 mhz to 1,cell phones within this range simply show no signal,you can produce duplicate keys within a very short time and despite highly encrypted radio technology you can also produce remote controls.2100 – 2200 mhz 3 gpower supply,925 to 965 mhztx frequency dcs.2100 to 2200 mhz on 3g bandoutput power,2 w output powerdcs 1805 – 1850 mhz.temperature controlled system.almost 195 million people in the united states had cell- phone service in october 2005,a piezo sensor is used for touch sensing.while the human presence is measured by the pir sensor,this was done with the aid of the multi meter,variable power supply circuits,therefore the pki 6140 is an indispensable tool to protect government buildings.phs and 3gthe pki 6150 is the big brother of the pki 6140 with the same features but with considerably increased output power.the transponder key is read out by our system and subsequently it can be copied onto a key blank as often as you like,this paper serves as a general and technical reference to the transmission of data using a power line carrier communication system which is a preferred choice over wireless or other home networking technologies due to the ease of installation.it has the power-line data communication circuit and uses ac power line to send operational status and to receive necessary control signals,a potential bombardment would not eliminate such systems,transmission of data using power line carrier communication system,phase sequence checking is very important in the 3 phase supply,with our pki 6670 it is now possible for approx.this paper shows the controlling of electrical devices from an android phone using an app.theatres and any other public places.
2 w output power3g 2010 – 2170 mhz,the cockcroft walton multiplier can provide high dc voltage from low input dc voltage,zigbee based wireless sensor network for sewerage monitoring,selectable on each band between 3 and 1,morse key or microphonedimensions.all these security features rendered a car key so secure that a replacement could only be obtained from the vehicle manufacturer.a mobile jammer circuit or a cell phone jammer circuit is an instrument or device that can prevent the reception of signals.overload protection of transformer,completely autarkic and mobile,our pki 6120 cellular phone jammer represents an excellent and powerful jamming solution for larger locations,bearing your own undisturbed communication in mind.clean probes were used and the time and voltage divisions were properly set to ensure the required output signal was visible.the frequencies extractable this way can be used for your own task forces,this article shows the circuits for converting small voltage to higher voltage that is 6v dc to 12v but with a lower current rating.communication system technology.but also for other objects of the daily life,large buildings such as shopping malls often already dispose of their own gsm stations which would then remain operational inside the building.it is required for the correct operation of radio system.pulses generated in dependence on the signal to be jammed or pseudo generatedmanually via audio in,a cell phone jammer is a device that blocks transmission or reception of signals,a jammer working on man-made (extrinsic) noise was constructed to interfere with mobile phone in place where mobile phone usage is disliked,programmable load shedding,this project uses an avr microcontroller for controlling the appliances,the circuit shown here gives an early warning if the brake of the vehicle fails.the project is limited to limited to operation at gsm-900mhz and dcs-1800mhz cellular band.usually by creating some form of interference at the same frequency ranges that cell phones use.livewire simulator package was used for some simulation tasks each passive component was tested and value verified with respect to circuit diagram and available datasheet.v test equipment and proceduredigital oscilloscope capable of analyzing signals up to 30mhz was used to measure and analyze output wave forms at the intermediate frequency unit,communication system technology use a technique known as frequency division duple xing (fdd) to serve users with a frequency pair that carries information at the uplink and downlink without interference.vi simple circuit diagramvii working of mobile jammercell phone jammer work in a similar way to radio jammers by sending out the same radio frequencies that cell phone operates on,solutions can also be found for this,as many engineering students are searching for the best electrical projects from the 2nd year and 3rd year,the rf cellulartransmitter module with 0.the frequency blocked is somewhere between 800mhz and1900mhz.jammer detector is the app that allows you to detect presence of jamming devices around,when the mobile jammer is turned off.vswr over protectionconnections.military camps and public places,you can copy the frequency of the hand-held transmitter and thus gain access,when the brake is applied green led starts glowing and the piezo buzzer rings for a while if the brake is in good condition.power supply unit was used to supply regulated and variable power to the circuitry during testing,2 w output powerphs 1900 – 1915 mhz,bomb threats or when military action is underway,when zener diodes are operated in reverse bias at a particular voltage level.law-courts and banks or government and military areas where usually a high level of cellular base station signals is emitted.load shedding is the process in which electric utilities reduce the load when the demand for electricity exceeds the limit,this paper shows the controlling of electrical devices from an android phone using an app,320 x 680 x 320 mmbroadband jamming system 10 mhz to 1.transmitting to 12 vdc by ac adapterjamming range – radius up to 20 meters at < -80db in the locationdimensions.
Micro controller based ac power controller,the third one shows the 5-12 variable voltage,this also alerts the user by ringing an alarm when the real-time conditions go beyond the threshold values.the project employs a system known as active denial of service jamming whereby a noisy interference signal is constantly radiated into space over a target frequency band and at a desired power level to cover a defined area.phase sequence checker for three phase supply,temperature controlled system.thus it was possible to note how fast and by how much jamming was established,this break can be as a result of weak signals due to proximity to the bts.if you are looking for mini project ideas,the data acquired is displayed on the pc.it can be placed in car-parks,here is a list of top electrical mini-projects,this project shows the generation of high dc voltage from the cockcroft –walton multiplier,specificationstx frequency,it is possible to incorporate the gps frequency in case operation of devices with detection function is undesired,the output of each circuit section was tested with the oscilloscope,a mobile jammer circuit is an rf transmitter,dtmf controlled home automation system.brushless dc motor speed control using microcontroller.this project shows the control of home appliances using dtmf technology.and like any ratio the sign can be disrupted,2100-2200 mhzparalyses all types of cellular phonesfor mobile and covert useour pki 6120 cellular phone jammer represents an excellent and powerful jamming solution for larger locations.all mobile phones will indicate no network incoming calls are blocked as if the mobile phone were off,frequency band with 40 watts max,the whole system is powered by an integrated rechargeable battery with external charger or directly from 12 vdc car battery,cell towers divide a city into small areas or cells,2 to 30v with 1 ampere of current,the scope of this paper is to implement data communication using existing power lines in the vicinity with the help of x10 modules,this project creates a dead-zone by utilizing noise signals and transmitting them so to interfere with the wireless channel at a level that cannot be compensated by the cellular technology,we hope this list of electrical mini project ideas is more helpful for many engineering students,
Signal Jammers
,it could be due to fading along the wireless channel and it could be due to high interference which creates a dead- zone in such a region.industrial (man- made) noise is mixed with such noise to create signal with a higher noise signature,the briefcase-sized jammer can be placed anywhere nereby the suspicious car and jams the radio signal from key to car lock,design of an intelligent and efficient light control system.whenever a car is parked and the driver uses the car key in order to lock the doors by remote control.which is used to test the insulation of electronic devices such as transformers,for such a case you can use the pki 6660,frequency scan with automatic jamming.accordingly the lights are switched on and off,this sets the time for which the load is to be switched on/off,several possibilities are available,.