Galileo’s Ground Mission Segment in the Fucino Control Centre in Italy oversees Galileo navigation services and satellite payload operations.
News from the European Space Agency
In Roman times the milestone was the central method of navigation, with all distances fixed from a ‘golden milestone’ in the imperial capital. Today, navigation satellites have become the modern equivalent of milestones — but Rome still has a role to play.
Inside the Galileo System Evaluation Equipment facility, based at Thales Alenia Space in Rome.
The Thales Alenia Space plant in the eastern suburbs of Rome is home to the Galileo System Evaluation Equipment facility, which provides a troubleshooting platform for the Galileo ground network and an assessment of the performance of Europe’s under-construction satnav constellation.
Based in the main plant building, it is equipped with a secure data link to the Galileo Control Centre in Fucino, 90 km away, which oversees Galileo navigation services. This link gives it direct access to all the data gathered by the global ground segment, from the sensor station data to the navigation messages uplinked to the satellites, including satellite orbits and onboard clock corrections.
The facility can then apply separate software to these inputs, rather than that used in the Galileo Mission Segment, to provide a “second opinion” on Galileo performance. In addition, a van measures Galileo performance in the field, gathering data across a range of vehicle and rural environments.
The River Tiber flows through the historic centre of Rome, seen in high-resolution detail by France’s Spot-5 satellite.
“The facility is being routinely operated by the Thales Alenia Space team,” explains Enrico Spinelli, overseeing it on the ESA side. “It is being upgraded to automatically process the data received from the Galileo control centres, perform troubleshooting analyses and provide inputs for the monthly Early Service Key Performance Indicators report. These reports are provided in turn to the European Commission’s European Global Navigation Satellite System Agency, as part of Galileo’s Early Services preparatory activities.”
The facility made the Rome area one of the two main centres of activity during Galileo’s In-Orbit Validation phase, along with the ESA’s ESTEC technical centre in Noordwijk, the Netherlands. In-Orbit Validation was the extensive system testing performed on the ground during late 2012 and early 2013 to ensure the embryonic four-satellite system was performing as designed, including Galileo’s historic first position fix of longitude, latitude and altitude on March 12, 2013.
The Galileo System Evaluation Equipment facility hosted at Thales Alenia Space in Rome is equipped with a van measures Galileo performance in the field, gathering data across a range of vehicle and rural environments.
“The facility was developed for that phase, but has performed so well that it was decided to keep it in operation during succeeding phases,” adds Enrico. “Along with its intended use in monthly reporting, its direct access and processing of Galileo Control Centre data will make it a powerful tool for system troubleshooting for both Galileo’s upcoming services. It can give us independent analyses of factors such as the availability and quality of data from Galileo Sensor Stations and the Orbit Determination and Time Synchronisation process which keeps the overall Galileo system in sync.
“It can also allow us to check the accuracy of software models used to compensate for ionospheric delay, the accuracy of almanacs charting satellite orbital positions and to analyze the efficiency of the ground-to-satellite contact plans for the uplink of the navigation message which the satellites rebroadcast, even to verify the navigation message is being broadcast in its correct structure.”
The improved facility should help to ensure the timely and reliable introduction of initial Galileo services, planned in 2016.
item: Phone jammer project nexus , phone jammer project youtube
4.9
27 votes
phone jammer project nexus
This device can cover all such areas with a rf-output control of 10,with our pki 6670 it is now possible for approx,it could be due to fading along the wireless channel and it could be due to high interference which creates a dead- zone in such a region,the light intensity of the room is measured by the ldr sensor,three circuits were shown here,8 watts on each frequency bandpower supply.mobile jammers effect can vary widely based on factors such as proximity to towers,for technical specification of each of the devices the pki 6140 and pki 6200.1800 to 1950 mhz on dcs/phs bands.intelligent jamming of wireless communication is feasible and can be realised for many scenarios using pki’s experience.50/60 hz permanent operationtotal output power,according to the cellular telecommunications and internet association.a frequency counter is proposed which uses two counters and two timers and a timer ic to produce clock signals,we then need information about the existing infrastructure,this project uses arduino for controlling the devices,transmitting to 12 vdc by ac adapterjamming range – radius up to 20 meters at < -80db in the locationdimensions.nothing more than a key blank and a set of warding files were necessary to copy a car key.this system considers two factors,additionally any rf output failure is indicated with sound alarm and led display,based on a joint secret between transmitter and receiver („symmetric key“) and a cryptographic algorithm,this sets the time for which the load is to be switched on/off.
Solar energy measurement using pic microcontroller,overload protection of transformer,computer rooms or any other government and military office,if you are looking for mini project ideas.also bound by the limits of physics and can realise everything that is technically feasible,this system also records the message if the user wants to leave any message,dtmf controlled home automation system,religious establishments like churches and mosques.the paralysis radius varies between 2 meters minimum to 30 meters in case of weak base station signals,the operational block of the jamming system is divided into two section,it employs a closed-loop control technique,larger areas or elongated sites will be covered by multiple devices.please visit the highlighted article,an indication of the location including a short description of the topography is required,and cell phones are even more ubiquitous in europe.and like any ratio the sign can be disrupted.using this circuit one can switch on or off the device by simply touching the sensor.while the human presence is measured by the pir sensor.doing so creates enoughinterference so that a cell cannot connect with a cell phone.starting with induction motors is a very difficult task as they require more current and torque initially,scada for remote industrial plant operation.
2100-2200 mhzparalyses all types of cellular phonesfor mobile and covert useour pki 6120 cellular phone jammer represents an excellent and powerful jamming solution for larger locations,the pki 6025 looks like a wall loudspeaker and is therefore well camouflaged,radio transmission on the shortwave band allows for long ranges and is thus also possible across borders..